AERO-Z: high transmission capacity overhead conductors

High transmission capacity overhead conductors installed in Africa

  • Nigelec (Société Nigérienne d'Electricité) project: reinforce the interconnection Nigeria - Niger 
  • Upgrade the capacity of a 264 km long 132kV power line between Birnin (Nigeria) and Niamey (Niger)
  • Project managed in record time by the INEO-Nexans consortium in 29 days
  • Selection of AERO-Z © conductors to increase the power transmission capacity of 75%
  • Reduction of fuel consumption
  • Medium and long term income and CO² savings

Products related:

overheadline_Nigeria

Electricity distribution for 1 788 431 homes

  • Rural Electrification Global Program - PERG launched in 1995 by the Office National de l'Electricité Morroco
  • 33 580 villages electrified by the end of July 2008 (including  3 466 using photovoltaic kits)
  • Nexans supplies: 22 000 km of medium voltage lines, 76 000 km of low voltage lines, 8500 transformers stations 
  • Rural electrification rate: 18% in 1995 and 95% at the end of July 2008
power_distribution_morocco